Find out how Greggs:
- Increased productivity by 146%
- Now complete four extra jobs, per engineer, per day
- Lowered subcontractor costs
- Reduced travel time between sites
- Became a more efficient planning team
- Saved an estimated £1million per year
Complete the form to read the article, first featured in FMJ magazine, to discover how Greggs created a state-of-the-art, technology-led, shop maintenance service with impressive results, increasing productivity 146%.